Deans Civil Engineering have been appointed by Ogilvie to carry out the substructure, drainage, and concrete superstructure for a new student accommodation block in Glasgow city centre.
Deans Civil Engineering have been appointed by Amey to carry out the groundworks for an extension to the existing high school and gym hall areas including substructure, drainage, and landscaping.
Deans Civil Engineering have been appointed by Graham Construction to carry out the concrete structures and public realm works associated with new energy centre that services the overall Buchanan Wharf development.
Working with Wood Group plc on behalf of Scottish Power we have been appointed to remove over 42km of temporary access roads and working platforms created for the installation of new power pylons and restore the area to a natural condition.
Deans Civil Engineering have been appointed directly by Peel Ports to carry out repairs to the existing drainage system and concrete yard repairs as part of the ongoing upgrades to the existing container yard.
Deans Civil Engineer have been appointed by Bowmer & Kirkland to carry out the landscaping to the Public Realm areas of this new office development in Glasgow city centre.
We have been appointed by Key Property Solutions to complete works on a new vehicle storage location for the Amazon facility in Worcester including the hard landscaping and large diameter drainage diversions.
Deans Civil Engineering have been working with The Football Company to design and instal fixings for the installation of new high level digital advertising boards to the full perimeter of Ibrox football stadium.
Deans Civil Engineering have been appointed directly by Iceland to carry out the groundworks for an extension to their food distribution hub.